After the Warley exhibition, the autocar moved to the GCR for some engineering adjustments and further tests. These were complete in time for the autocar to run in the 2020 Winter Gala over the 25th & 26th January. Judging by the photos and comments I’ve seen so far, there was plenty of interest. My thanks to Paul Abell and Sean Croshaw for the use of their photographs.
-
Afterwards, unloading the autocar at Quorn. (Dave Moore)
-
Unloading the autocar after travelling from Warley. (Dave Moore).
-
In the shed - a study in light and shadow? (Dave Moore)
-
Gala Day - the autocar draws attention from the crowds. (Paul Abell)
-
Every seat taken. The autocar about to depart. (Sean Croshaw).
-
A view from the bridge. (Sean Croshaw)
-
3170 at Loughborough. (Sean Croshaw).
-
Two LNER engines. (Sean Croshaw)
-
3170 about to pass a freight. (Sean Croshaw)